Sustainable Hybrid Pavement Concrete Floor

Concrete Pavements haven't changed in decades - Until Now

Why Engineers choose CC-Grid Floor

  • Install over old surfaces or base layer
  • No need for form work, rebar
  • Fast setting and low maintenance
  • Ideal for high-traffic and industrial zones
  • A smarter, safer, faster pavement upgrade

Why It Matters

STRONGER

  • M60 concrete performance from an M30 mix
  • Hybrid rigid–flexible behaviour improves load distribution and reduces cracking

FASTER

  • CC Grid system clips together easily
  • Faster installation / shorter project timelines / higher productivity

GREENER

  • At just 40 mm thickness, the system significantly reduces concrete consumption
  • 100% recycled plastic. Less concrete. Less carbon

How it Works

  • The concrete within the grid is cured completely
  • A grinding or polishing machine is used to remove the top thin layer of concrete
  • As the surface is ground, the CC grid lines become exposed
  • This results in a uniform, patterned surface that acts as both a structural and aesthetic feature

Benefits

  • Unique grid-pattern decorative flooring
  • Strong, durable, and visually appealing
  • Ideal for commercials

ABOUT

Civil chemicals introduces a hybrid technology that combines the rigidity of concrete with the flexibility of engineered polymer grids. The result is a pavement that resists cracking, handles heavy traffic, and installs in a fraction of the time. Built with recycled materials, CC-Grid is as sustainable as it is strong.

CC-Grid floor is the evolution of concrete surfaces — unitized, flexible, and visually uniform. Designed for modern spaces, high-load floors, and long-life pavements. A blend of engineering intelligence and environmental.

Why It Matters

Using less concrete lowers carbon emissions, conserves resources, improves air quality, and cuts construction costs—building a more sustainable future.

New Icon Stronger Faster

  • Built for industries, farms, retail, mining, golf courses, car parks, walkways, ramps, and more.
  • Background — 50–75% transparent grid and finished floor picture.

CC-Grid Floor – SIMPLE INSTALLATION STEPS

LAY THE GRID

  • Place the grid sheets on the ground
  • Press firmly on the clips so each sheet locks properly

INSTALL EDGE SUPPORTS

  • Fit CC grid edging on all exposed edges to keep concrete inside the cells
  • In areas where vehicles may drive off the edge, install steel wire as extra protection

FILL WITH CONCRETE

  • Recommended mix:
    -> M30, 100–120 slump, 12mm aggregate
  • Use a rake to level concrete close to the top of the grid
  • Use a surface vibrating screed for a smooth, even pass

FIRST FINISH

  • After screeding, run a power trowel at slow speed with flat blades
  • Use a rubber squeegee to remove excess slurry and expose the top of the grid

FINAL FINISH

  • Once bleed water disappears, do another slow pass with the trowel
  • When your thumb leaves only a slight mark, it is ready for the final finish
  • Blades should scrape lightly — if stones flick, they’re too high
  • Use finishing aid not water, during finishing

CURING

Concrete must be cured properly:

  • Option 1: Pond Curing
    Build a sand bund around edges and flood the surface
    Keep submerged for 3 days (best method)
  • Option 2: Curing Compound
    When walkable, spray a water-based curing compound over the surface

DECORATIVE FINISH

Exposed Grid Pattern
After the concrete has fully cured, the surface can be mechanically ground or polished to reveal the CC-grid pattern beneath the topping layer. This creates a decorative, geometric finish where the grid lines become visible, giving a modern and unique architectural look.